Tag Archive for Tag: Biogas construction cost

Tag: Biogas construction cost Material Cost Estimate for Construction of a 10 Cubic Meter Fixed Dome Biogas Plant

  The following comprises of materials and equipment cost estimates for the construction of a 10 cubic meter Fixed Dome Biogas Plant: Cement (24), Sand (7), Ballast (4), Stones (400), Water Proof Cement (4), R6 (1), Waste Pipe 4” (1), Gi Pipe 1” (1), Bricks (400), Binding Wire (1), Paint Brush 6” (1),   Dome Pipe  (1) Material and Equipment Cost

View Article...